Middle Tennessee Electric Bringing Good Energy

The Buses Are Full. Some Mornings, They Have to Drive Past You.

There is a particular kind of problem that only shows up when something is working. Murfreesboro Transit has one.

Ridership across the system rose between 10 and 25 percent over the summer, according to transit director Russ Brashear, and the increase has pushed some routes past what the current fleet can absorb. On the busiest runs the buses fill, and a full bus cannot stop for everyone waiting. Riders are occasionally left standing as a bus goes by — which, if you are the person standing there with somewhere to be, is not a statistic about growth. It is a missed shift.

The city is in the early stages of working toward three additional buses in the coming year. Three does not sound like much until you understand what it buys: enough vehicles to double up on the heaviest routes, running two buses where one runs now and effectively halving the wait, with the possibility of a new route left over.

A system that spent years being the underdog

Public transit in a city built like Murfreesboro has always had to argue for itself. Rutherford County grew outward along state highways and subdivision collectors, in the low-density pattern that American cities adopted after 1950 — a shape that is superb for cars and punishing for buses, because riders end up scattered too thinly for frequent service to pencil out. For a long stretch, the local system was something most residents knew existed without ever having ridden it.

What has changed is partly arithmetic. Murfreesboro has added tens of thousands of residents since 2000, and density eventually does arrive — along Broad, around the Square, near campus. MTSU alone concentrates a large population that skews toward people who would rather not maintain a car. Add the cost of insuring and parking a vehicle, and a bus that actually goes where you need to go becomes a rational choice rather than a last resort.

The city has also been investing on the assumption that this day would come. The transit center on New Salem Highway — three buildings and six bus canopies on a 5.74-acre site, finished last year at a cost of about $17.3 million — replaced an arrangement that was never designed for a system this size, and it took the 2025 Transit Development of the Year Award from the Transit Alliance of Middle Tennessee. Council has separately approved new shelters, the unglamorous infrastructure that determines whether waiting fifteen minutes in August is tolerable.

The window where this gets decided

Three buses is a budget conversation, and budget conversations are where transit growth usually stalls — not because anyone opposes buses, but because rolling stock competes against paving, drainage and public safety in the same finite year. Systems that expand tend to be the ones whose riders show up and say so while the number is still being written.

Which makes the timing here worth noting. The city's Citizens Academy starts Monday, Sept. 14, eight weeks of sessions with the directors of the 27 departments that make exactly these calls. If you have ever watched a full bus go past your stop, that is a room worth being in.

Author

Related Articles

Back to top button